Increasing the Capacity of the Shipunloader at berth (19) at Shuaiba Port

Increasing the Capacity of the Shipunloader at berth (19) at Shuaiba Port

This year, the capacity and potential of the shipunloader at berth (19) at Shuaiba Port have been increased for the raw materials required for production, this by implementing some adjustments on it so as to raise the unloading capacity to its maximum by a rate of 25% thus satisfying the material needs for the first kiln and part those needs for the second kiln. We are hopeful that the concerned authorities would expedite matters by approving the installation of a second shipunloader at berth No. (20) at Shuaiba Port as the quantities of raw materials to be supplied to the new kiln and the first kiln will exceed in total (seven million) tons annually, this to ensure continuous provision of cement to the local market and to abide by the domestic and international environmental requirements.